Amazon · Project Rainier ↗
Site imagery, multi-site context and cable colors (blue NeuronLink, yellow EFA). Building positions and equipment quantities in this model are illustrative.
AWS / PROJECT RAINIER / 01
A data center campus brings computing buildings together with the infrastructure that keeps their equipment operating.
ILLUSTRATIVE REFERENCE MODEL · NOT PRODUCTION CAD
Loading 3D model…
Compute buildings
These buildings contain data halls and their equipment.
Representative campus composition based on published imagery. Building quantities, equipment identities and locations are not a surveyed site plan.
These buildings contain data halls and their equipment. Select a building to inspect its role, then choose “Enter the data hall” to continue to the machines it supports.
Site imagery, multi-site context and cable colors (blue NeuronLink, yellow EFA). Building positions and equipment quantities in this model are illustrative.
General AWS power and cooling infrastructure. This does not establish the cooling assembly of every Rainier server.
Training and serving compute context. Anthropic’s overall usage does not establish an Indiana site inventory.
Original authored geometry. No private CAD, exact facility floor plan, current deployment total, or measured performance is implied. Cooling and networking lines show relationships, not surveyed routes.
Independent learning project. Not affiliated with or endorsed by NVIDIA, AMD, Meta, xAI, AWS, Anthropic or Supermicro. Product names and logos are trademarks of their owners. Images and 3D models are illustrations.
Loading detailed Blender model…