Skip to campus explorer
HOW COMPUTE WORKSAll experiences
CAMPUSMeta · Prometheus

PROMETHEUS / NEW ALBANY, OHIO

Prometheus campus

Three building types · illustrative layout

Opening the 3D campus…

Drag to orbit
Sources & model notesMeta report · October 19, 2026

What this model shows

The three building types come from Meta’s article. The rapid-deployment structure follows Meta’s campus film; the other two forms and the site layout are illustrative. The model does not show the real number, size or position of the buildings.

No campus capacity is calculated from the buildings or rack slots drawn here.

  • Meta campus film · 00:01–00:03

    Curved rapid-deployment roof, ridge caps, louvered end wall and twin entry pods. Site arrangement and the other two building forms are illustrative.

Sources

Reported figures

Source snapshot reviewed October 24, 2026. A deployment report, a goal and a system configuration measure different things.
ClaimValueStatus / scopeSource section
First phaseCompleteReported complete
Prometheus first phase; used to train Meta’s Muse models
Introduction
Reported deploymentHundreds of thousands of GPUsReported operating
Prometheus across interconnected buildings
The Supercluster: Unlocking New AI Capabilities
Full-scale goal~1 million GPUsPlanned
Full-scale Prometheus, not the first phase
The Supercluster: Unlocking New AI Capabilities
GPUs in the NVLink domain72Documented configuration
One Clemente NVLink domain
Clemente: NVIDIA GB300 NVL72
Compute racks per NVLink domain1Documented configuration
One Clemente NVLink domain
Clemente: NVIDIA GB300 NVL72
GPUs on one building networkUp to 20,736Documented configuration
One building-level Ethernet fabric
Network Fabrics
Distance between connected building networks2 km to over 100 kmDocumented configuration
Backend Aggregation (BAG) network across Prometheus
Aggregation
GPUs a job uses in each 72-GPU domain64, with 8 in-rack sparesReported practice
Each NVL72 domain in Meta’s training runs
The 72-GPU Failure Domain
Clemente GPU memory288 GB HBM3e per GPU (20.7 TB per rack)Documented configuration
One Clemente GB300 NVL72 rack
Clemente: NVIDIA GB300 NVL72
Clemente NVLink bandwidth130 TB/s per domain (1.8 TB/s per GPU)Documented configuration (peak)
One Clemente NVLink domain
Clemente: NVIDIA GB300 NVL72
Clemente rack powerAbout 135 kWDocumented configuration
One Clemente rack
Clemente: NVIDIA GB300 NVL72
Clemente network per GPU800G (ConnectX-8)Documented configuration
Backend network bandwidth per Clemente GPU
Clemente: NVIDIA GB300 NVL72
Catalina racks per NVLink domain2 (36 GPUs each)Documented configuration
One Catalina GB200 NVL72 domain (Ariel variant)
Catalina: NVIDIA GB200
Catalina GPU memory192 GB HBM3e per GPU (13.4 TB per domain)Documented configuration
One Catalina GB200 NVL72 domain
Catalina: NVIDIA GB200
Catalina NVLink bandwidth130 TB/s per domainDocumented configuration (peak)
One Catalina NVLink domain, across both racks
Catalina: NVIDIA GB200
Catalina network per GPU800G (2 × 400G ConnectX-7)Documented configuration
Backend network bandwidth per Catalina GPU
Catalina: NVIDIA GB200
Catalina system powerAbout 120 kW across the two racksDocumented configuration
One Catalina rack pair
Catalina: NVIDIA GB200